The Palace restoration is due to be completed later this year ,is there any news on a possible finish date?
It is in the planning that the King moves to Huis ten Bosch at the end of this year.
The natural hardstone has been removed from the outside stairs and will be replaced with new hardstone (
picture)
This was the 17th C hardstone, cracks are visible (
picture)
The dome of Huis ten Bosch is completely covered in scaffoldings (
picture)
The copper tiles of the dome have been removed because the woodwork of the dome will be renewed (
picture)
The stucco in the Marot Chamber: the cracks have been "crabbed out" and will be refilled with new stucco (
picture)
Detail of the stucco in the Chinese Salon, already cleaned (
picture)
Also the tympanums are in restoration (
picture)
New copper rain gutters for the building (
picture)
The 1970's climate control is removed from the 17th C building (
picture)
Bad parts of the fundaments are drilled away (
picture)
Replacement of bad parts (
picture)
Wood rot in some of the 17th C beams (
picture)
It will be a lot of work before Huis ten Bosch will be ready again (
picture)